Within a server room or datacentre environment an uninterruptible power supply should be sized to meet day-one loads and provide additional capacity for future expansion. A UPS system is just one element of the critical power path which can also include building incomers, transformers, LV switchboards, switchgear, distribution panels and power distribution units. It is critically important that each element is sized correctly and there are two ways to calculate the power being drawn which can be measured in VA or Watts.