09/10/2020

How to Size a UPS System and Battery Runtime

An uninterruptible power supply is a product designed to provide protection from mains borne power problems and a source of backup power when the mains power supply fails. For most people, the two main questions when deciding on the right UPS solution for their application is what size UPS do I need and how long a runtime is required.

Single Phase UPS Sizes

Uninterruptible power supplies are available in three standard topologies. These are referred to as standby/off-line, line interactive and on-line. Each provides a different grade of power protection with standby/off-line being the lowest and on-line UPS mode the highest.

Regardless of the type of UPS, the system will be sized in either VA or Watts. VA is referred to as the ‘Apparent Power’ and is calculated by multiplying the total Amps (A)required by the load(s) multiplied by the Voltage (V) that the load(s) are plugged into.

Load 1 (Amps) + Load 2 (Amps) + Load 3 (Amps) etc = Total Load Amps

The UK single phase power supply is 230Vac, 50Hz and for a 4Amp total load the VA would be: 230 × 3 = 690VA. It is always prudent to add 20% headroom for load growth and so this load for UPS sizing would be 690 × 1.2 = 828VA. Most UPS manufacturers will offer a range of UPS systems and for this load size, the nearest UPS would be a 1000VA (1kVA) system.

The Apparent Power (VA) of a load is related to the Watts rating by a term referred to as the Power Factor (pF). Most UPS systems will be rated from 0.9 to 0.7 power factor and in this instance the Real Power (Watts) required by the load can be calculated by multiplying the VA by the power factor if known or adding up the Watts of the loads. The formula for calculating the Watts could be one of the following:

Load 1 (Watts) + Load 2 (Watts) + Load 3 (Watts) etc = the total Load in Watts

The total VA x Power Factor = the total Load in Watts i.e. 828 x 0.9 = 745Watts. The inverse is also true in that Watts / Power Factor = VA.

Three Phase UPS Loads

In the UK, the three phase mains power supply is 400Va 50Hz. The supply consists of three single phase supplies arranged at 120 electrical degrees apart. If we are looking at a three-phase load, then calculate the total VA or Watts per phase and then add these together.

  • Phase 1 Load 1 (Watts) + Load 2 (Watts) + Load 3 (Watts) etc = the total Load in Watts
  • Phase 2 Load 1 (Watts) + Load 2 (Watts) + Load 3 (Watts) etc = the total Load in Watts
  • Phase 3 Load 1 (Watts) + Load 2 (Watts) + Load 3 (Watts) etc = the total Load in Watts

Then Phase 1 Load + Phase 2 Load + Phase 3 Load = the total Load in Watts

Again, it is prudent to add 20% headroom for load growth. Three phase loads will require a 3phase UPS system and will be powered from a three phase mains power supply. The arrangement is often referred to as a 3/3 configuration. It is possible to have a 3/1 configuration where the supply to a single-phase load (1) is ‘spread’ across the three (3) phases of the mains power supply.

UPS Battery Runtimes

Once the total load has been calculated, the second question can be answered and that is ‘how long should the UPS provide backup power for’? An uninterruptible power supply is an energy storage device and the most common method for storing and delivering energy is a battery set. Some UPS systems for short duration runtimes (milliseconds) can be installed with supercapacitors as their energy storage component but the more traditional method is a battery.

The most installed battery, whether it is an uninterruptible power solution, emergency lighting, generator starter motor or even a security alarm panel, is a lead acid battery. Lead-acid technology has been around since 1860 and was invented by Gaston Planté. The battery technology since then has evolved to the type of modern battery we have today but the principle operation is essentially the same, lead plates and an electrolyte. Today’s lead-acid batteries are valve-regulated lead acid (VRLA) and maintenance free. Their typical design life is either 5 years or 10 years and you can expect a working life of 3-4 and 7-8 years respectively and in terms of complete charge/discharge cycles around 300-400.

The batteries for a UPS system are sized in Ampere-hours (Ah) and arranged into a battery string or set of battery strings to provide a set Ah at the DC voltage required by the UPS inverter. There is a lot more engineering to this and to reduce the need for battery UPS manufacturers will publish their data to show the runtime available for their UPS system at a set load.

For example, UPS manufacturer ‘A’ may state their 1kVA online UPS provides 7minutes at full load. Manufacturer ‘B’ may say 10minyes at 80% load. There is a bit of ‘specmanship’ and so it is useful to read the small print and find out if there are any caveats on the battery runtimes stated.

However, what must be remembered is that a lead acid battery has a non-linear discharge curve. The lower the load the longer the battery will provide power for. If the UPS has been sized correctly, with the 20% headroom, then the expected battery backup time will be longer. Some line interactive and most online UPS systems can also be installed with extended runtime packs to increase backup times from minutes to several hours.

How Much UPS Backup Time Do You Need?

The electrical supply industry uses the term ‘power outage’ to describe the loss of mains power. The electricity generation and supply industry in the UK is overseen by OFGEM who apply severe financial penalties to industry players when there is a power outage longer than 3minutes. Unless there is a severe power failure like the one in the UK in August 2019, most power outages last minutes rather than hours. It is also common for power outages to occur several times within a short space of time i.e. multiple short duration interruptions caused by the failure of a local substation or electrical distribution infrastructure and its automated rectification or from an overhead electrical storm and nearby lighting strikes.

More information:
https://www.ofgem.gov.uk/publications-and-updates/investigation-9-august-2019-power-outage

For short duration power outages (or power cuts), most UPS system batteries are sized in terms of minutes and to last from 10-30minutes. This provides sufficient time to allow the UPS to ride through the mains power supply interruption or initiate a locally installed UPS shutdown software package and gracefully power down the local network server loads. For larger loads, like server rooms and datacentres, the facility may also have a local standby power generator which can automatically start and be up to full power within 1-2minutes of being initiated. The 10-30minute period here provides a safety window in case the generator does not start straight away due to a starter motor battery problem, open circuit breaker (from a maintenance visit) or air in the fuel supply lines.

The runtime for any UPS installation is therefore a function of the loads to be powered and the available energy sources, either battery or battery & local generator supply. Some sites also apply load shedding when the mains power supply fails. Critical loads remain powered but some essential and all non-essential loads are ‘dropped’. The reduced load on the UPS increase the runtime available from the stored energy.

Lithium UPS Batteries

Lithium batteries are revolutionising many aspects of modern life. Typical applications include mobile phones, tablets, and electric vehicles. Lithium batteries options are also available for some UPS types. Though they command a higher price than lead acid, there are advantages that can make their installation preferred for UPS installations.

Lithium-ion batteries offer a higher energy density than lead acid leading to a smaller footprint. The batteries can also withstand higher ambient temperatures without degrading; lead acid batteries require a room ambient of 20-30⁰C as for every 1degree above 30⁰C, their design life halves. Lithium-ion batteries also cycle faster than lead acid and have a design life of 15years plus.

Lithium-ion batteries are the preferred technology for local energy storage systems. These store off-peak energy from the local grid or on-site power generation (solar or wind turbines) for use as battery backup or to supply to the grid as part of a demand response and frequency stabilisation program.

Lithium UPS systems can also provide both functions if the UPS has a bidirectional rectifier/converter section. The concept is like that of Vehicle-two-Grid (V2G) power generation and can be thought of as UPS-two-Grid (UPS2G) supply. Eaton describes this as their EnergyAware and UPS-as-a-Reserve (UPSaaR) technology.

More information
https://powerquality.eaton.com/emea/upsaar/default.asp

Summary

Sizing a UPS system is relatively straightforward whether it is for a single phase or three phase load and configuration. What is important is to identify all the critical, essential and non-essential loads and to identify those that have to be kept powered when there is a mains power supply interruption and for how long in order for the organisation to continue operations. Whilst most installations will be made with a lead acid battery set, there are alternative energy storage options including supercapacitors and lithium-ion batteries. Standby power generators can also be used to increase the support time of the UPS and provide several hours or even days of runtime.

Blog main image 1570341 1614335961

Related blog posts

23/09/2021
Prev Article
Using Lead Acid v Lithium-ion Batteries in UPS Backup Solutions
Blog box fixed 2112641 1632588001

When selecting a UPS system to protect your server room or other critical IT applications, how do you choose between a traditional lead acid battery for your UPS and the latest lithium-ion battery backup solutions? Whilst lithium-ion battery packs offer longer working lives, lead acid are the more cost effective and to a wider degree more environmentally friendly. The choice often comes down to cost, availability, and the application needs.

Read more ...
15/10/2019
Next Article
Calculating The Cost of Replacing a UPS Battery Set
Blog box fixed 1183291 1607528581

Uninterruptible power supplies have several consumable parts of which the battery set is the costliest requiring replacement at least once or twice during its working life. What costs should you take into consideration when deciding whether to replace your UPS batteries or upgrade to a new UPS system?

Read more ...